Tuam Mixed Unit Development, Tuam, Co. Galway

Tuam Mixed Unit Development, Tuam, Co. GalwayClient:  Coffey Group
Consultant:  Coffey Constuction
Value:  €15 million 
Method of Procurement:  Design, Build and Finance project
Project Description:
Development of a new housing estate for Coffey Group in Tuam Co Galway. The development included all site works and building works on the site for the 144 Units. Coffey Construction carried out all the planning, design and Financing in house. The Development consisted of 144 units comprising 2 bedroom apartments, 3 bed Terrace houses, crèche, 3 and 4 bedroom semidetached and 4 bedroom detached homes. We acquired the site, our own team of architects did the planning drawings, applied for planning and fire safety certificate and managed the construction of the project. The Units were, special in that they were designed as house of tomorrow and won an award from SEI for their design and sustainability. The house was constructed using a steel frame with a high level of insulations and used a Air to Air HEAT PUMP to generate the hot water and heating for the house and apartments.

The scope of the works undertaken by Coffey Construction is as follows:

  • Excavation for foundations,
  • Insitu reinforced concrete slab
  • Block work external and internal walls
  • Internal  and External Plastering
  • Timber cut roof.
  • Extensive waterproofing to basement.
  • Internal joinery.
  • All internal finishes including painting and fixtures and fittings.
  • Kitchen fit out including all appliances
  • Design and fitting of M+E.
  • All site works including drainage, water, sewer, roads and paths.
  • All landscaping was carried out to all the house and estate.

Coffeys are also responsible for maintaining the estate as a 20 year operational phase