Rail Archive Listing
 
UB 158 & UB 161

UB 158 & UB 161

The works consisted of the renewal of 2 number bridges (UB 158 & UB 161 close to Athenry,Co Galway) on consecutive weekends on the Dublin to Galway Line.
More Details


Tullamore Carpark

Tullamore Carpark Extension

The project involved extending the existing car park facility from 120 existing spaces to 405 (4,565m2) at Tullamore Station. The works was carried out in a manner as to minimise disruption to the public and users of the car park. The newly constructed car park was located in a “brownfield” site therefore care and attention had to be exercised during earthworks regarding the presence of potential contaminated material due to previous locomotive engine repair works.
More Details


0B 961 Whytes

0B 96A Whytes

An overbridge with associated approach embankments, walls, fencing, safety barriers and drainage replaced the Iarnród Éireann Level Crossings XE72 and XE73.
More Details


UB86, UB96 & UB136 bridge renewals

UB86, UB96 & UB136 bridge renewals

This project was to renew 3 number bridges (UB86, UB96 & UB136) on the Limerick to Tuam line. The existing wrought bridges were replaced by new reinforced concrete decks. The works involved the casting of the new decks onsite using precast units supplied free issue by Irish Rail. Work was carried out under Irish Rail supervision and during possessions.
More Details


New platforms and platform extensions

New platforms and platform extensions at the following stations:

Roscommon, Ballyhaunis, Woodlawn, Attymon, Gorey, Enniscorthy, Portarlington,Edgeworthstown, Boyle, Dromod, DART, Tullamore, Dundalk, Drogheda, Balbriggan, Laytown, Rathmore, Farnfore, Clongriffen,Claremorris, Bray, Monasterevin, Hazelhatch,Athlone.
More Details


Galway Route Accessibility - 
Tullamore, Ballinasloe, Woodlawn Attymon Stations

Galway Route Accessibility - Tullamore, Ballinasloe, Woodlawn Attymon Stations

The primary objective of this project was to render the station accessible to mobility and visually impaired customers in compliance with relevant legislation and appropriate standards, guides, and codes of practice.
More Details


Belfast Route Accessibility Contracts – 
Balbriggan & Laytown Station

Belfast Route Accessibility Contracts – Balbriggan & Laytown Station

The primary objective of this project wasto render the station accessible to mobility and visually impaired customers in compliance with relevant legislation and appropriate standards, guides, and codes of practice.
More Details


Belfast Route Accessibility Contracts – 
Dundalk & Drogheda Stations

New platforms and platform extensions at the following stations:

The primary objective of this project wasto render the station accessible to mobility and visually impaired customers in compliance with relevant legislation and appropriate standards, guides, and codes of practice. The secondary objective wasto carry out other enhancement works to the station at the same time as the planned accessibility work in order to ensure that construction works were co-ordinated;cost efficienciesin design, tender and construction; abortive work avoided and passenger disruption minimised.
More Details


Galway Route Accessibility Project

Galway Route Accessibility Project

This project consisted of the construction of a new footbridge, stairs and lifts at Tullamore Station on the Galway to Dublin railway line.
More Details


Seapoint Station Accessibility Project

Seapoint Station Accessibility Project

The works consisted of the construction of lift shafts and a new footbridge at Seapoint Station on the DART line.
More Details


UB 153 – Co Galway

UB 153 – Co Galway

The project involvedstrengthening works to railway under bridges on the Limerick to Tuam line on its Ennis to Athenry section. Some masonry at the soffit of the arch had fallen out and there were longitudinal cracks in the barrel of the arch.
More Details


Repairs to Arch 6 & 7 of UB82 Boyne Viaduct, 
Drogheda, Co. Louth

Repairs to Arch 6 & 7 of UB82 Boyne Viaduct, Drogheda, Co. Louth

Some masonry at the soffit of arch seven had fallen out and there were longitudinal cracks in the barrel of the arch approximately 2m inside the west face (parallel to the west face) one of which is quite noticeable.
More Details


Cork to Cobh Cable Packages – Co. Cork

Cork to Cobh Cable Packages – Co. Cork

The project consisted of the installation of 4Km of 250mm wide precast cable troughing units alongside the railway track.
More Details


Manulla Embankment Stabilisation Works

Manulla Embankment Stabilisation Works

An embankment section of the Westport to Dublin line in Manulla was under distress due to the existing steep embankment 1:1.
More Details


UBC 313 Bridge Replacement

UBC 313 Bridge Replacement

The objective of the project was to renew the 2 spans and abutments of the existing Awbeg River Bridge, known as UBC 313. The replacement was to be carried out in a 59-hour period (28-31 October 2011).
More Details


UB129B Newtons, Co Galway

UB129B Newtons, Co Galway

The works involved the installation of a precast culvert under the railway line on the main Dublin to Galway line. The culvert consisted of twelve 2.4m x 2.9m box culvert units and the overall length of new culvert was 24m. The works were carried out during night possessions under a full closure.
More Details


McDonagh Station, Kilkenny City

McDonagh Station, Kilkenny City

The project consisted of the construction of two under-track crossing for road traffic and pedestrians at McDonagh Station to provide access from the Dublin Road.
More Details


 Civil Engineering Works for Embankment Stabilisation at 191/4 mile post

Civil Engineering Works for Embankment Stabilisation at 191/4 mile post

The object of the project is to stabilise a section of the existing up side embankment at the 191/4 mile post adjacent to UBE56 on the Limerick to Tuam Railway line.
More Details


Closure of Level Crossing XC049

Closure of Level Crossing XC049

The project involved the closing of existing level crossing and replacement with newly constructed 15m clear Portal structure with 5.1m clearance from the railway.
More Details


Over Bridge 157a

Over Bridge 157a

To replace existing Level Crossing with newly constructed Overbridge consisting of Portal Structure, Reinforced Earth Wingwalls & Associated embankments and road surfacing tie ins.
More Details


Construct Base at Clara Station

Construct Base at Clara Station

Clara (construction of new turnout) & Tullamore (removal of debris at bas of rock cutting).
More Details