Roads Archive Listing
 
R161 Navan Road

R161 to R153 Link Road Contract 2

Construction of 85m long reinforced concrete bridge over the River Boyne and the construction of new road between the N3 and existing road at Athlumney heights with a length of 1.2km long.
More Details


Oban to Fort William National Cycle Network

Oban to Fort William National Cycle Network (Route 78) 2010/2011 Works – A828

The project comprises improvements to four sections along existing National Cycle Network (Route 78). The project extends over approximately 29km and consists of the construction of a 2.5m to 3m wide cycle track along the A828 road verge (3.6km), dismantled railway line (1.5km) and existing carriageways of local or disused road (14.5km).
More Details

N52 & N62 Junction Upgrade Scheme

N52 & N62 Junction Upgrade Scheme

Construction of a 31m dia roundabout on the N52 /N62 junction at the Roscrea Road in Birr, Co. Offaly to tie in with the Tesco store, and a mini roundabout and new road construction at the N52 junction on the Nenagh Road.
More Details

A1 The Limes Beeston Road

A1 The Limes Beeston Road

The project involved the construction of section 278 works for Fairview New Homes. The work was carried out next to the A1 road near sandy, Bedfordshire.
More Details

A4 Bath Road,Elmshott Lane, Station Road Improvements

A4 Bath Road,Elmshott Lane, Station Road Improvements

The project involved the modification of the existing signalised cross road junction to improve pedestrian and cycle crossing facilities.
More Details

Apsley Mill Site B and C

Apsley Mill Site B&C

The contract involved section 278 works for the new development access road off London Road, Hemel Hampstead.
More Details

Charlestown Road Infrastructural Works

Charlestown Road Infrastructural Works

The works consisted of the upgrading and realignment of existing St. Margaret’s Road and construction of new Charlstown Avenue and associated slip roads. Charlestown Avenue connects the existing North Road (N2) to St. Margaret’s Road. The site was a green-field site and land use was agricultural / grazing.
More Details

Curo Park Junction Improvement

Curo Park Junction Improvement

The project involved the modification of the existing entrance to a commercial development to improve the entrance to the development, pedestrian and cycle crossing facilities.
More Details


Wicklow Port Access & Town Relief Road - Structures

Wicklow Port Access & Town Relief Road - Structures

As part of the new 4.5 kilometres single carriageway Wicklow Port Access Road around the town of Wicklow, several new bridge structures were constructed.
More Details


N7 Interchange Bridge

N7 Interchange Bridge

The scheme is approximately 4.7 kilometres in length, with further accommodation roads and interchange ramps.
More Details


N20 Croom By-Pass

N20 Croom By-Pass

The Croom by-pass was constructed to by-pass the town of Croom on the Main N20 Cork to Limerick road. The scope of the works undertaken included:
More Details


Nenagh By-Pass

Nenagh By-Pass

The Nenagh by-pass was constructed to by-pass the town of Nenagh on the Main N7 Dublin to Limerick road. The scope of the works undertaken included:
More Details


Navan Inner Relief Road & Bridge

Navan Inner Relief Road & Bridge

Construction of 85m long reinforced concrete bridge over the River Boyne and the construction of new road between the N3 and existing road at Athlumney Heights 1.2 kilometres long. The construction of footpaths and cycle lanes were included in the contract. Surfacing of the 1.2Km carriageway with basecourse and wearing course, white lining and antiskid measures on the bridge deck. Handrailing was installed along the top of the parapet walls.
More Details


Watergate Bridge, Trim

Watergate Bridge, Trim

Construction of new bridge to replace existing concrete bridge which was built almost 100 years ago and had been subject to flood damage.
More Details


OB221 - Templemore, Co Tipperary

OB221 - Templemore, Co Tipperary

This project is part of Irish Rail Level Crossing Replacement Project. Level crossing XC99 is approximately 5 kilometres to the south of Templemore, Co. Tipperary in the town land of Clondoty on the Dublin to Cork railway line.
More Details


Mill Bridge Rehabilitation, County Longford

Mill Bridge Rehabilitation, County Longford

The mill bridge at Cloondara is a five arch masonry bridge in a bad state of repair, both structurally and visually, on the local Killashee to Tarmonbarry road over the River Camlin. A section of masonry wall between arches 4 and 5 was close to collapse leaning outwards due to the continuous heavy traffic over the years. The bridge walls themselves had become overgrown in vegetation. Many of the pavement stones in arches 1, 2 and 3 had become dislodged.
More Details


Kerry Culverts, County Kerry

Kerry Culverts, County Kerry

This project involved the replacement of four stone arch culverts and the widening of two bridges on hairpin bends along the ring of Kerry.
More Details


Strengthening and Rehabilitation of Structures in Longford and Meath

Strengthening and Rehabilitation of Structures in Longford and Meath

The scheme involved remedial works to three bridges on the National Roads network in County Longford and County Meath, including complete and/or partial demolition and removal of existing structures, construction of replacement structures and/or elements thereof.
More Details


Dublin Outer Ring Road (Kingswood to Adamstown)

Dublin Outer Ring Road (Kingswood to Adamstown)

The Outer Ring Road (ORR) – N7 to Adamstown roundabout is a new dual carriageway regional distributor road approximately 4.7 kilometres in length, linking the N7 National Primary Route at Kingswood, to a proposed new roundabout, servicing the Adamstown area in Clondalkin west County Dublin.
More Details


Charlestown Road Infrastructural Works

Charlestown Road Infrastructural Works

The works consisted of the upgrading and realignment of existing St. Margaret’s Road and construction of new Charlstown Avenue and associated slip roads. The contract involved the construction of 500m of new dual carriageway with 450m of side roads & two roundabouts, upgrading and realignment of 460m of the existing St Margret’s Road. Extensive traffic management was required for construction works on the N2 and St. Margarets Road.
More Details

R363 Cam Quarry Road Realignment

R363 Cam Quarry Road Realignment

The project consisted of a 1 kilometre construction of a newly re-aligned road on the R363 main Athlone to Tuam Road. The re-alignment works were necessary as part of a planning condition for Roadstone Provinces Ltd regarding the opening of a new quarry.
More Details


N52 & N62 Junction Upgrade Scheme

N52 & N62 Junction Upgrade Scheme

The project consisted of the development of a 31m ICD four arm roundabout with provision for future connections on the N62 Junction at the Roscrea Road and the construction of a four armed mini roundabout including 80m of link road and associated works on the N52 Junction at the Nenagh Road in Birr, Co. Offaly.
More Details


Naas Road Quality Bus Corridor - Red Cow to Long Mile Road

Naas Road Quality Bus Corridor - Red Cow to Long Mile Road

The purpose of this project was to construct new cycle-lanes, footpaths and bus lanes along the inbound and outbound carraigeways of the Naas Road (R110) between the Red Cow Hotel and the Long Mile Road approximately 900m in length in both directions. Various other accommodation works were also carried out including the installation of underground services, construction of new chambers, bus stops etc. The duration of this project was approximately twelve weeks.
More Details


Gaddagh Bridge

Gaddagh Bridge

The project involved demolition and removal of the existing Gaddagh Bridge, which was already partially collapsed due to flood damage, followed by its replacement with a new five arched masonry clad in-situ reinforced concrete bridge together with associated approach road works, river training and riverbed protection works, drainage and accommodation works for utility services.
More Details


N62 Bridge Widening, Co Tipperary

N62 Bridge Widening, Co Tipperary

The contract involved the widening of five bridges in north Tipperary County.
More Details


Bothar na dTreabh (N6) MMCI Scheme Phase 3

Bothar na dTreabh (N6) MMCI Scheme Phase 3

Improvement works are proposed to the Font and Morris roundabouts. The roundabouts will be replaced by new traffic signalised junctions.
More Details


Access Road and Drainage Repairs to Croaghmoyle Mast

Access Road and Drainage Repairs to Croaghmoyle Mast

The project provides for the construction of approximately 320m of 38kv ducting in accordance with ESB Networks Standard Specification. The works will be carried out on a greenfield site and there may be some excavation of rock required.
More Details


Alterations & Extension to Supervalu Carpark

Alterations & Extension to Supervalu Carpark

The works can be described as scrubbing up of trees, roots, shrubs, grass verges, organic soil, and the demolition of existing walls, the removal of existing kerbs and associated foundations, the removal of existing lamp posts, poles etc to facilitate the construction of a new carpark layout.
More Details


(ETN) Edinburgh Tram Network

(ETN) Edinburgh Tram Network

The project consists of the following :
More Details